Yes, on most houses in Haywards Heath a back window can become a set of bifold doors. It is building work first and a door job second: the wall under the sill comes out, a new beam goes in, and the doors are measured once the new opening is finished.

What changes when a window becomes a doorway

Three things change: the wall, the floor and the outside. The brickwork below the sill is cut away down to floor level. If the opening is also made wider, the lintel above has to be replaced with a longer one or a steel beam.

Inside, the floor has to run level to the new threshold. Outside, the ground has to sit below the door, with a drain or a fall so rain runs away from it. On many Victorian houses the garden is higher than the floor, so the patio needs lowering near the doors.

The sides of the new opening are closed off neatly, with the cavity sealed where there is one. Then the opening is plastered inside and made good outside, ready for the doors.

Which Haywards Heath houses make it easy

A 1930s semi is often the simplest case. It has cavity walls, a dining room window at the back and a level garden. A three-leaf set of about 2.4 metres is a common result.

The stock brick villas around Oathall Road and The Heath have thick solid walls. They take a new opening well, but the beam needs careful sizing and the brick outside needs matching. On houses with tile hanging, like many interwar homes by Harold Turner, the tiles around the opening come off and go back on.

Newer houses are usually quick, but check two things first. The planning permission for the estate may have removed some rights, and the structural warranty may need telling before a wall is cut. Our page on doors by house type covers each age in more detail.

Describe the window and the wall below it on a short call. Ring 01444 719602 or book a 15-minute slot.

Building Regulations come first

A new or wider opening is not a straight swap, so it needs building control approval. That is separate from the FENSA sign-off that covers doors put into an existing opening. Mid Sussex District Council explains on its building control questions page that you may need building approval even when no planning is needed.

An engineer works out the size of the beam, following the rules in Approved Document A on structure. Your builder sends the application and arranges the inspections. The glass in the new doors must be safety glass, as Approved Document K sets out for glass that reaches the floor.

The doors also have to meet the heat-loss limit for new doors. Every good aluminium system does this, but ask for the figure in writing.

Planning permission

For a house, a new door opening at the back is usually permitted development, as long as the materials look similar to the rest of the house. A new door in a side wall is worth checking first, and the Planning Portal has the national limits for both.

Listed houses always need consent first. In the Cuckfield and Lindfield conservation areas, Article 4 directions take away many of the usual rights, so ask the council. Our planning guide for bifold doors goes through each case.

The order of work

StageWho does itTypical time
Call and home visitYou and the door companyA week or two to arrange
Beam sizing and building controlEngineer and your builderOne to three weeks
Forming the opening, floor and drainYour builderA few days
Survey of the finished openingDoor companyOne visit
Making the doorsDoor companyA few weeks
Fitting and sign-offFitters, then building controlAbout a day, then an inspection

Your builder handles the first half and the door company the second. The two only overlap at the survey, which waits until the opening is built.

The doors are never measured from a drawing. A few millimetres out on a made-to-measure set means a gap or a door that won't close, so the opening comes first.

How wide to go

Many back windows are 1.5 to 2 metres wide. Turning one into doors is a good time to widen it a little, because the beam goes in anyway. A two-leaf set suits a narrow opening, and three leaves suit about 2.1 to 3 metres.

Wider than that, a new opening starts to cost more in building work than in doors. The aluminium bifolds page explains how leaf sizes work, and the prices page shows whole-job totals.

Once your builder has a date for the opening, ring 01444 719602 or arrange your call and the survey can be booked to follow it.

Questions

Questions people ask

Who does the building work for a new door opening?

Your builder. They cut the opening, fit the beam, sort the floor and the ground outside, and deal with building control. The door company fits the doors once the opening is finished. If you have no builder, ask at the home visit, as the installer may know local builders who do this work.

Can bifolds go where a window meets a bay?

Not usually in the bay itself, because the angled sides carry the roof of the bay and leave no room for the stack. A flat back wall is the usual place. A bay can be rebuilt as a square box with doors, but that is a bigger job and may need planning.

Will cutting a doorway let damp into the house?

Not if the opening is closed off and finished properly. The cavity is sealed at the sides, a damp-proof course runs under the threshold and the ground outside sits below the floor. A drain or a fall away from the doors stops rain pooling at the foot of the frame.

How long is the house open to the weather?

Often only a day or two. The builder can form the opening and board it up, then the doors arrive a few weeks later to fit. Many owners leave the old window in until the beam is in, so the room stays sealed. Plan the dates with both trades before work starts.

Related guides

  • Blinds and curtains for bifolds: Integral blinds, blinds on each leaf, a blind over the whole opening or curtains on a long track, and which suits which room.
  • Planning for bifold doors: When bifolds at the back of a Mid Sussex house need no application, and when listing, Article 4, a flat or an estate condition means asking first.

For the doors themselves, see our page on aluminium bifold doors.

Planning the opening now? Ring 01444 719602 or book a 15-minute call and a specialist will talk through the doors.

Bifold doors folded fully open and stacked to one side of a wide opening
Free, no obligation

Get an answer for your own house

A door specialist will talk through your opening on a free 15-minute call. If you want a written price, they will send someone to the house.

Call 01444 719602Book a call