Skip to content
Supply only

Supply-only bifold doors for Haywards Heath builders

Haywards Heath, Burgess Hill, Lindfield and Cuckfield

If your builder is forming the opening and fitting the doors, the doors can be supplied on their own. The catch is that someone has to own the measurements.

Wrapped bifold door frames on a pallet beside a new brick extension
How it works

Who measures, who fits, who signs off

With supply only, the doors are made to the sizes you or your builder give and delivered to site. Your builder fits them. That suits self-builds and larger extensions where a main contractor is already on site.

It also moves three jobs to your side: the sizes, a square and level opening, and the Building Regulations sign-off. A replacement door that's more than half glazed is controlled work. So it has to be fitted by a registered installer or approved by building control. In a new extension, building control signs it off as part of the job.

If any of that is a worry, a supplied-and-fitted quote is usually the safer route. Ask for both and compare.

Builders in Burgess Hill and Horsham often order this way for rear extensions. To check what your order needs, ring 01444 719602 or book a call.

Fitter checking a bifold door frame with a spirit level
Before the order

What goes on the order

  • Structural opening

    Width and height of the finished opening, measured in three places, with the smallest figure used. Doors are made a little smaller to leave a fixing gap.

  • Leaf layout

    Number of leaves, which end they fold to, whether they fold in or out, and which leaf is the traffic door.

  • Threshold

    Flush or weathered, plus the floor height indoors and the patio height outdoors.

  • Frame and glass

    Colours inside and out, the glass, the handles, and any trickle vents the building control officer asks for.

The regulations

What a supply-only door still has to meet

Energy. Part L of the Building Regulations covers energy use. In England, a replacement glazed door must meet it. The 2021 edition of Approved Document L caps the whole door at 1.4 W/m²K. So ask for the figure for the actual door set, not just the glass.

Safety glass. Approved Document K treats glass in and next to doors as a critical location, which means toughened or laminated glass. Bifold leaves are made that way as standard; check any fixed side panel too.

Ventilation. If the old doors or windows in the room had trickle vents, the new work should not leave the room with less ventilation than before. Ask building control early if the room is a kitchen with no other vent.

Sign-off. In a new extension, building control signs off the doors with the rest of the work. A straight replacement might be fitted by a builder who isn't in a competent person scheme. Then your builder has to apply to building control before the old doors come out.

On site

Delivery, storage and fitting

  • Delivery

    Bifold leaves are heavy and awkward. Plan for at least two people to unload them, clear a route from the road to a dry spot, and check the delivery note against the order before anyone signs.

  • Storage

    Keep the frames and leaves wrapped, flat or upright as the maker says, and out of the way of mixers, barrows and the other trades. Most damage to supply-only doors happens before they are fitted.

  • Fitting

    Your builder should follow the maker's fitting guide for packers, fixings, the threshold and sealing. The hardware guarantee usually depends on it, so ask for the guide with the order.

  • Guarantee

    With supply only, the product guarantee covers the doors themselves. Problems caused by fitting are a matter between you and your builder.

Questions

Supply only: common questions

Is supply only much cheaper?

You save the fitting, but you pay your own builder to do it instead, and you carry the risk if a measurement is wrong. The saving is usually smaller than people expect. Compare a supplied-and-fitted quote before deciding.

Who is responsible if the doors do not fit?

With supply only, the person who gave the measurements. That is why the order is checked against a written list of sizes before anything is made.

Does a supply-only door need a FENSA certificate?

A replacement glazed door needs either a registered installer or building control approval. If your builder is not registered, they will need to involve building control.

Can I switch to supplied and fitted later?

Usually, as long as the order has not been placed. Once the doors are made to your builder's sizes, the fitting normally stays with your builder.

Two fitters carrying a glazed bifold door leaf across a lawn
Free, no obligation

Book a free 15-minute call

Give a door specialist the rough width, and a photo if you have one. You get plain advice on the layout, and a written price after a free home visit if you decide to take it further.

Call 01444 719602Book a call